Thin Line Abstract  Shape Illustration
Horiz More Icon

Railway investments

M3C1


OCT 18th 2023

NRRP task force

Ministry of Infrastructures and Transport


Thin Line Abstract  Shape Illustration
Orange Gradient Background

overview

Horiz More Icon

M3C1 - 1.1

high speed railway connections to the south for passengers and freight

desired outcome
outcome icon

Improving connections for inhabitants in Southern Italy to the high-speed railway network, while ensuring territorial cohesion and equity, supporting the demand of local mobility, and feeding the system of high-speed connections at national level.

total rrp resources for this measure
GENERAL OVERVIEW
White Circle Vector

4.64

€bn

sub-measures / lines

Arrow

1.1.1 Naples - Bari

Arrow

1.1.2 Messina - Catania - Palermo

Arrow

1.1.3 Salerno - Reggio Calabria

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Horiz More Icon

1.1.1 NAPLES - BARI

Horiz More Icon

1.1.1 NAPLES - BARI

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Gold circle neon light

ORSARA - BOVINO

proposed defunding

RRP funds

53 mln €

Final target (km)

11.8

Costing

(initial forecast)

per km

-

(2023 forecast)

per km

560 mln €

47 mln €

(after remodulation)

per Km

0

0

arrow icon
arrow icon

0

0

Notes


Due to administrative delays, including delays on the DNSH and VIA procedures, it is not possible to meet the 2026 deadline.

Horiz More Icon

1.1.1 NAPLES - BARI

Gold circle neon light
Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

APICE - HIRPINIA

651

of which 197

for new projects

RRP fund (mln €)

612

Final target (km)

18.7

Costing

(initial forecast)

per km

-

(2023 forecast)

per km

883

47

(after remodulation)

per Km

893

48

arrow icon


Notes


Geological challenges that were not foreeseeable, including a landslide front and abnormal presence of natural gas, have caused a 12 months delay that has been mitigated

Horiz More Icon

1.1.1 NAPLES - BARI

Gold circle neon light
Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

vitulano - telese

RRP funds

293

Final target (km)

11.2

Costing

(initial forecast)

per km

-

(2023 forecast)

per km

1705*

36*

(after remodulation)

per Km

1713*

37*

arrow icon

346

*costing details are referred to the whole lot CANCELLO - VITULANO

Notes


-

Horiz More Icon

1.1.1 NAPLES - BARI

Gold circle neon light
Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

FRASSO - TELESE

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Geological challenges that were not foreeseeable, including a landslide front and abnormal presence of natural gas, have caused a 12 months delay that has been mitigated

*costing details are referred to the whole lot Telese -

Horiz More Icon

1.1.1 NAPLES - BARI

Gold circle neon light
Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

cancello - frasso

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Horiz More Icon

1.1.1 NAPLES - BARI

Gold circle neon light
Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

NAPLES - CANCELLO

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Thin Line Abstract  Shape Illustration
Horiz More Icon

COME CAMBIA IL PNRR - CONNESSIONI VS SUD

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.1 Napoli - Bari

Variante Napoli Cancello

Cancello - Frasso Telesino

Frasso - Telese

Telese - Vitulano

Orsara - Bovino

Apice - Hirpinia

913

642

394

667

560

883

107

38

296

293

53

612

-

-

-

-

-

-

15.6

16.5

11.2

19.1

-

18.7

15.6

16.5

11.2

19.1

11.8

18.7

1.1.2 Messina - Catania - Palermo

Lotto 3 Caltanissetta Birbi - Lercara

Lotto 4a Enna - Caltanissetta - Xirbi

Lotto 4b Dittaino - Enna

Lotto 5 Catenanuova - Dittaino

Lotto 6 Bicocca - Catenanuova

Velocizzazione linea storica Palermo - Catania

2045

1531

795

778

469

84

470

-

297

321

35

-

-

317

-

-

-

-

-

-

14.9

21.8

37.4

110

47.1

26.7

14.9

21.8

37.4

-

1.1.3 Salerno - Reggio Calabria

Lotto prioritario: Battipaglia Romagnano

2755

-

1800

33

33




































Thin Line Abstract  Shape Illustration
Horiz More Icon

COME CAMBIA IL PNRR - CONNESSIONI VS SUD

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.1 Napoli - Bari

Variante Napoli Cancello

Cancello - Frasso Telesino

Frasso - Telese

Telese - Vitulano

Orsara - Bovino

Apice - Hirpinia

913

642

394

667

560

883

307

38

333

346

-

454

-

-

-

-

-

197

15.6

16.5

11.2

19.1

-

18.7

15.6

16.5

11.2

19.1

-

18.7

1.1.2 Messina - Catania - Palermo

Lotto 3 Caltanissetta Birbi - Lercara

Lotto 4a Enna - Caltanissetta - Xirbi

Lotto 4b Dittaino - Enna

Lotto 5 Catenanuova - Dittaino

Lotto 6 Bicocca - Catenanuova

Velocizzazione linea storica Palermo - Catania

2045

1531

795

778

469

84

-

-

434

576

35

-

-

-

50

-

-

70

-

-

14.9

21.8

37.4

110

-

-

14.9

21.8

37.4

-

1.1.3 Salerno - Reggio Calabria

Lotto prioritario: Battipaglia Romagnano

2755

-

1800

33

33




































Up
Cute Organic Equal Sign
Up
Up
Up
Up
Up
Up
Cute Organic Equal Sign
Up
Up
Up
Up
Up
Red arrow down
Up
Up
Up
Red arrow down
Red arrow down

+ 200 mln

-

+ 37 mln

+ 53 mln

+ 39 mln

-

-

+ 187 mln

+ 255 mln

+ 70 mln

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Horiz More Icon

1.1.2 MESSINA - CATANIA - PALERMO

Gold circle neon light
Horiz More Icon

1.1.2 MESSINA - CATANIA - PALERMO

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

bicocca - catenanuova

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Gold circle neon light
Horiz More Icon

1.1.2 MESSINA - CATANIA - PALERMO

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

catenanuova -

dittaino

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Gold circle neon light
Horiz More Icon

1.1.2 MESSINA - CATANIA - PALERMO

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

DITTAINO - ENNA

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Gold circle neon light
Horiz More Icon

1.1.2 MESSINA - CATANIA - PALERMO

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

ENNA - caltanissetta xirbi

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Gold circle neon light
Horiz More Icon

1.1.2 MESSINA - CATANIA - PALERMO

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

CALTANISSETTA

XIRBI - LERCARA

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Gold circle neon light
Horiz More Icon

1.1.2 MESSINA - CATANIA - PALERMO

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration

lercara -

catenanuova

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Thin Line Abstract  Shape Illustration
Horiz More Icon

COME CAMBIA IL PNRR - CONNESSIONI VS SUD

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.1 Napoli - Bari

Variante Napoli Cancello

Cancello - Frasso Telesino

Frasso - Telese

Telese - Vitulano

Orsara - Bovino

Apice - Hirpinia

913

642

394

667

560

883

107

38

296

293

53

612

-

-

-

-

-

-

15.6

16.5

11.2

19.1

-

18.7

15.6

16.5

11.2

19.1

11.8

18.7

1.1.2 Messina - Catania - Palermo

Lotto 3 Caltanissetta Birbi - Lercara

Lotto 4a Enna - Caltanissetta - Xirbi

Lotto 4b Dittaino - Enna

Lotto 5 Catenanuova - Dittaino

Lotto 6 Bicocca - Catenanuova

Velocizzazione linea storica Palermo - Catania

2045

1531

795

778

469

84

470

-

297

321

35

-

-

317

-

-

-

-

-

-

14.9

21.8

37.4

110

47.1

26.7

14.9

21.8

37.4

-

1.1.3 Salerno - Reggio Calabria

Lotto prioritario: Battipaglia Romagnano

2755

-

1800

33

33




































Thin Line Abstract  Shape Illustration
Horiz More Icon

COME CAMBIA IL PNRR - CONNESSIONI VS SUD

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.1 Napoli - Bari

Variante Napoli Cancello

Cancello - Frasso Telesino

Frasso - Telese

Telese - Vitulano

Orsara - Bovino

Apice - Hirpinia

913

642

394

667

560

883

307

38

333

346

-

454

-

-

-

-

-

197

15.6

16.5

11.2

19.1

-

18.7

15.6

16.5

11.2

19.1

-

18.7

1.1.2 Messina - Catania - Palermo

Lotto 3 Caltanissetta Birbi - Lercara

Lotto 4a Enna - Caltanissetta - Xirbi

Lotto 4b Dittaino - Enna

Lotto 5 Catenanuova - Dittaino

Lotto 6 Bicocca - Catenanuova

Velocizzazione linea storica Palermo - Catania

2045

1531

795

778

469

84

-

-

434

576

35

-

-

-

50

-

-

70

-

-

14.9

21.8

37.4

110

-

-

14.9

21.8

37.4

-

1.1.3 Salerno - Reggio Calabria

Lotto prioritario: Battipaglia Romagnano

2755

-

1800

33

33




































Up
Cute Organic Equal Sign
Up
Up
Up
Up
Up
Up
Cute Organic Equal Sign
Up
Up
Up
Up
Up
Red arrow down
Up
Up
Up
Red arrow down
Red arrow down

+ 200 mln

-

+ 37 mln

+ 53 mln

+ 39 mln

-

-

+ 187 mln

+ 255 mln

+ 70 mln

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Horiz More Icon

1.1.1 NAPLES - BARI

Horiz More Icon

1.1.1 NAPLES - BARI

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Gold circle neon light

ORSARA - BOVINO

proposed defunding

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Thin Line Abstract  Shape Illustration
Horiz More Icon

COME CAMBIA IL PNRR - CONNESSIONI VS SUD

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.1 Napoli - Bari

Variante Napoli Cancello

Cancello - Frasso Telesino

Frasso - Telese

Telese - Vitulano

Orsara - Bovino

Apice - Hirpinia

913

642

394

667

560

883

107

38

296

293

53

612

-

-

-

-

-

-

15.6

16.5

11.2

19.1

-

18.7

15.6

16.5

11.2

19.1

11.8

18.7

1.1.2 Messina - Catania - Palermo

Lotto 3 Caltanissetta Birbi - Lercara

Lotto 4a Enna - Caltanissetta - Xirbi

Lotto 4b Dittaino - Enna

Lotto 5 Catenanuova - Dittaino

Lotto 6 Bicocca - Catenanuova

Velocizzazione linea storica Palermo - Catania

2045

1531

795

778

469

84

470

-

297

321

35

-

-

317

-

-

-

-

-

-

14.9

21.8

37.4

110

47.1

26.7

14.9

21.8

37.4

-

1.1.3 Salerno - Reggio Calabria

Lotto prioritario: Battipaglia Romagnano

2755

-

1800

33

33




































Thin Line Abstract  Shape Illustration
Horiz More Icon

COME CAMBIA IL PNRR - CONNESSIONI VS SUD

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.1 Napoli - Bari

Variante Napoli Cancello

Cancello - Frasso Telesino

Frasso - Telese

Telese - Vitulano

Orsara - Bovino

Apice - Hirpinia

913

642

394

667

560

883

307

38

333

346

-

454

-

-

-

-

-

197

15.6

16.5

11.2

19.1

-

18.7

15.6

16.5

11.2

19.1

-

18.7

1.1.2 Messina - Catania - Palermo

Lotto 3 Caltanissetta Birbi - Lercara

Lotto 4a Enna - Caltanissetta - Xirbi

Lotto 4b Dittaino - Enna

Lotto 5 Catenanuova - Dittaino

Lotto 6 Bicocca - Catenanuova

Velocizzazione linea storica Palermo - Catania

2045

1531

795

778

469

84

-

-

434

576

35

-

-

-

50

-

-

70

-

-

14.9

21.8

37.4

110

-

-

14.9

21.8

37.4

-

1.1.3 Salerno - Reggio Calabria

Lotto prioritario: Battipaglia Romagnano

2755

-

1800

33

33




































Up
Cute Organic Equal Sign
Up
Up
Up
Up
Up
Up
Cute Organic Equal Sign
Up
Up
Up
Up
Up
Red arrow down
Up
Up
Up
Red arrow down
Red arrow down

+ 200 mln

-

+ 37 mln

+ 53 mln

+ 39 mln

-

-

+ 187 mln

+ 255 mln

+ 70 mln

Orange Gradient Background

overview

Horiz More Icon

M3C1 - 1.1

high speed railway connections to the south for passengers and freight

desired outcome
outcome icon

Improving connections for inhabitants in Southern Italy to the high-speed railway network, while ensuring territorial cohesion and equity, supporting the demand of local mobility, and feeding the system of high-speed connections at national level.

total rrp resources for this measure
GENERAL OVERVIEW
White Circle Vector

4.64

€bn

sub-measures / lines

Arrow

1.1.1 Naples - Bari

Arrow

1.1.2 Messina - Catania - Palermo

Arrow

1.1.3 Salerno - Reggio Calabria

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Horiz More Icon

1.1.1 NAPLES - BARI

Horiz More Icon

1.1.1 NAPLES - BARI

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Gold circle neon light

ORSARA - BOVINO

proposed defunding

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Thin Line Abstract  Shape Illustration
Horiz More Icon
Circle with Neon Lights

COME CAMBIA IL PNRR - CONNESSIONI DIAGONALI

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.3.1 Roma - Pescara

Lotto 1: Interporto - Manoppello

Lotto 2: Scafa Manoppello

917

-

620

-

32


PM 228 - Castelplanio con by-pass di Albacina

Lotto 2 Genga -Serra San Quirico

621

-

438

8.9


1.3.2 Orte - Falconara

Raddoppio PM 228 - Albacina

167

-

36

3.9

20


Velocizzazione tratte Orte - Falconara

36

-

36

tbd



1.3.3 Battipaglia - Taranto

Lotto prioritario tratta Potenza -Metaponto: interventi di velocizzazione Grassano - Bernalda

513

-

414

14

35


Velocizzazione Battipaglia - Potenza

90

20

16

70


Thin Line Abstract  Shape Illustration
Horiz More Icon
Circle with Neon Lights

COME CAMBIA IL PNRR - CONNESSIONI DIAGONALI

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.3.1 Roma - Pescara

Lotto 1: Interporto - Manoppello

Lotto 2: Scafa Manoppello

917

-

-

-

-


PM 228 - Castelplanio con by-pass di Albacina

Lotto 2 Genga -Serra San Quirico

621

-

454

8.9


1.3.2 Orte - Falconara

Raddoppio PM 228 - Albacina

167

-

130

3.9

13


Velocizzazione tratte Orte - Falconara

36

-

36

tbd



1.3.3 Battipaglia - Taranto

Lotto prioritario tratta Potenza -Metaponto: interventi di velocizzazione Grassano - Bernalda

513

-

414

14

14


Velocizzazione Battipaglia - Potenza

90

20

44

70

+60

Cute Organic Equal Sign
Cute Organic Equal Sign
Up

+ 28 mln

Up
Up
Red arrow down

-620 mln

+ 16 mln

+ 94 mln

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Horiz More Icon

1.1.1 NAPLES - BARI

Horiz More Icon

1.1.1 NAPLES - BARI

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Gold circle neon light

ORSARA - BOVINO

proposed defunding

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Thin Line Abstract  Shape Illustration
Horiz More Icon
Circle with Neon Lights

COME CAMBIA IL PNRR - CONNESSIONI DIAGONALI

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.3.1 Roma - Pescara

Lotto 1: Interporto - Manoppello

Lotto 2: Scafa Manoppello

917

-

620

-

32


PM 228 - Castelplanio con by-pass di Albacina

Lotto 2 Genga -Serra San Quirico

621

-

438

8.9


1.3.2 Orte - Falconara

Raddoppio PM 228 - Albacina

167

-

36

3.9

20


Velocizzazione tratte Orte - Falconara

36

-

36

tbd



1.3.3 Battipaglia - Taranto

Lotto prioritario tratta Potenza -Metaponto: interventi di velocizzazione Grassano - Bernalda

513

-

414

14

35


Velocizzazione Battipaglia - Potenza

90

20

16

70


Thin Line Abstract  Shape Illustration
Horiz More Icon
Circle with Neon Lights

COME CAMBIA IL PNRR - CONNESSIONI DIAGONALI

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.3.1 Roma - Pescara

Lotto 1: Interporto - Manoppello

Lotto 2: Scafa Manoppello

917

-

-

-

-


PM 228 - Castelplanio con by-pass di Albacina

Lotto 2 Genga -Serra San Quirico

621

-

454

8.9


1.3.2 Orte - Falconara

Raddoppio PM 228 - Albacina

167

-

130

3.9

13


Velocizzazione tratte Orte - Falconara

36

-

36

tbd



1.3.3 Battipaglia - Taranto

Lotto prioritario tratta Potenza -Metaponto: interventi di velocizzazione Grassano - Bernalda

513

-

414

14

14


Velocizzazione Battipaglia - Potenza

90

20

44

70

+60

Cute Organic Equal Sign
Cute Organic Equal Sign
Up

+ 28 mln

Up
Up
Red arrow down

-620 mln

+ 16 mln

+ 94 mln

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Horiz More Icon

1.1.1 NAPLES - BARI

Horiz More Icon

1.1.1 NAPLES - BARI

Map of Italy Divided into 20 Administrative Regions. White Land and Black Outline Borders. Simple Flat Vector Illustration
Gold circle neon light

ORSARA - BOVINO

proposed defunding

RRP funds


Final target (km)


Costing

(initial forecast)

per km


(2023 forecast)

per km


(after remodulation)

per Km


Notes


Thin Line Abstract  Shape Illustration
Horiz More Icon
Circle with Neon Lights

COME CAMBIA IL PNRR - CONNESSIONI DIAGONALI

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.3.1 Roma - Pescara

Lotto 1: Interporto - Manoppello

Lotto 2: Scafa Manoppello

917

-

620

-

32


PM 228 - Castelplanio con by-pass di Albacina

Lotto 2 Genga -Serra San Quirico

621

-

438

8.9


1.3.2 Orte - Falconara

Raddoppio PM 228 - Albacina

167

-

36

3.9

20


Velocizzazione tratte Orte - Falconara

36

-

36

tbd



1.3.3 Battipaglia - Taranto

Lotto prioritario tratta Potenza -Metaponto: interventi di velocizzazione Grassano - Bernalda

513

-

414

14

35


Velocizzazione Battipaglia - Potenza

90

20

16

70


Thin Line Abstract  Shape Illustration
Horiz More Icon
Circle with Neon Lights

COME CAMBIA IL PNRR - CONNESSIONI DIAGONALI

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.3.1 Roma - Pescara

Lotto 1: Interporto - Manoppello

Lotto 2: Scafa Manoppello

917

-

-

-

-


PM 228 - Castelplanio con by-pass di Albacina

Lotto 2 Genga -Serra San Quirico

621

-

454

8.9


1.3.2 Orte - Falconara

Raddoppio PM 228 - Albacina

167

-

130

3.9

13


Velocizzazione tratte Orte - Falconara

36

-

36

tbd



1.3.3 Battipaglia - Taranto

Lotto prioritario tratta Potenza -Metaponto: interventi di velocizzazione Grassano - Bernalda

513

-

414

14

14


Velocizzazione Battipaglia - Potenza

90

20

44

70

+60

Cute Organic Equal Sign
Cute Organic Equal Sign
Up

+ 28 mln

Up
Up
Red arrow down

-620 mln

+ 16 mln

+ 94 mln

Orange Gradient Background
Purple Abstract Wavy Lines
Horiz More Icon

INVESTIMENTI PNRR - MISSIONE 3

Golden circle
Brushstroke Arrow Smooth Curve Down

circa il 50% dei fondi è destinato al Sud d’Italia

Italy map a 3d render isolated with Puglia italian regions

IL PNRR MIT IN PUGLIA

Horiz More Icon

In Puglia, il PNRR prevede investimenti ferroviari il cui valore complessivo ammonta a circa 5 miliardi di euro.


Tra questi, in particolare, vi è l’investimento Collegamenti ferroviari ad Alta Velocità con il Mezzogiorno per passeggeri e merci (Napoli – Bari), che ha un valore originario complessivo di circa 1.400 milioni di euro di risorse PNRR. A seguito delle proposte di rimodulazione la tratta Orsara-Bovino potrebbe essere dirottata su fondi nazionali, essendo già inclusa nel Contratto di Programma tra MIT e RFI.


Per quanto riguarda la tratta Taranto-Metaponto-Potenza-Battipaglia, che originariamente era stata finanziata per 450 milioni di euro, è stato richiesto un incremento di 28 milioni di euro, per un totale complessivo di 468 milioni di euro, a fronte di un target chilometrico che potrebbe passare da 35 a 74 km.



Round Circle Dots
Horiz More Icon

MISURA 1.6 - STAZIONI REGIONALI

Italy map a 3d render isolated with Puglia italian regions

IL PNRR MIT IN PUGLIA /2

Horiz More Icon

IInoltre, sono previste risorse PNRR pari a circa 3.000 milioni di euro per ulteriori interventi ferroviari multiregionali che coinvolgono anche la regione Puglia.


In particolare, per il potenziamento e miglioramento delle linee regionali (complessivi circa 422 milioni di euro), per l’elettrificazione e aumento della resilienza delle ferrovie nel Sud (complessivi circa 671 milioni di euro) e per il miglioramento delle stazioni ferroviarie al Sud (complessivi circa 700 milioni di euro).


Per quanto, invece, riguarda gli investimenti relativi all’aggiornamento dei sistemi di sicurezza con lo sviluppo del Sistema europeo di gestione del traffico ferroviario ERTMS per complessivi circa 820 milioni di euro e il potenziamento dei nodi ferroviari e dei collegamenti nazionali chiave (complessivi circa 335 milioni di euro), tali investimenti potrebbero essere rimodulati sia quantitativamente nel target sia nell’ammontare complessivo, per cui risulta ancora difficile quantificare i cambiamenti per la singola Regione.




Round Circle Dots
Thin Line Abstract  Shape Illustration
Horiz More Icon
Circle with Neon Lights

COME CAMBIA IL PNRR - CONNESSIONI DIAGONALI

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.3.1 Roma - Pescara

Lotto 1: Interporto - Manoppello

Lotto 2: Scafa Manoppello

917

-

620

-

32


PM 228 - Castelplanio con by-pass di Albacina

Lotto 2 Genga -Serra San Quirico

621

-

438

8.9


1.3.2 Orte - Falconara

Raddoppio PM 228 - Albacina

167

-

36

3.9

20


Velocizzazione tratte Orte - Falconara

36

-

36

tbd



1.3.3 Battipaglia - Taranto

Lotto prioritario tratta Potenza -Metaponto: interventi di velocizzazione Grassano - Bernalda

513

-

414

14

35


Velocizzazione Battipaglia - Potenza

90

20

16

70


Thin Line Abstract  Shape Illustration
Horiz More Icon
Circle with Neon Lights

COME CAMBIA IL PNRR - CONNESSIONI DIAGONALI

Misura PNRR

Progetto

CVI

Risorse

Progetti in essere

Risorse

Nuovi progetti

KPI Fisico

(Km potenz)

Target UE finale (giu’26)

1.3.1 Roma - Pescara

Lotto 1: Interporto - Manoppello

Lotto 2: Scafa Manoppello

917

-

-

-

-


PM 228 - Castelplanio con by-pass di Albacina

Lotto 2 Genga -Serra San Quirico

621

-

454

8.9


1.3.2 Orte - Falconara

Raddoppio PM 228 - Albacina

167

-

130

3.9

13


Velocizzazione tratte Orte - Falconara

36

-

36

tbd



1.3.3 Battipaglia - Taranto

Lotto prioritario tratta Potenza -Metaponto: interventi di velocizzazione Grassano - Bernalda

513

-

414

14

14


Velocizzazione Battipaglia - Potenza

90

20

44

70

+60

Cute Organic Equal Sign
Cute Organic Equal Sign
Up

+ 28 mln

Up
Up
Red arrow down

-620 mln

+ 94 mln

Thin Line Abstract  Shape Illustration
Horiz More Icon

GRAZIE